Skip to content

Assignment 3 Cost andQualityThisassignment is a continuatio

    Assignment 3: Cost andQualityThisassignment is a continuation and enhancement of Assignment 2.Create aWork Breakdown Structure (WBS), and assign resources and cost by using a projectmanagement tool. As the IT project manager, you have been assigned a project todeploy ten (10) wireless access points in your company’s warehouse and breakroom within the next ninety (90) days. You are free to make assumptions thatsatisfy the scope of the project such as training, wiring, consulting efforts,etc.Yoursubmission will be made in .mpp format and will be graded on the accuracy ofyour work package assumptions and duration estimates.In yourassignment, address the following:Create 15 or more decomposed workpackages into 4 levels that are assigned to 5 or more main tasks (75 lineitems).Ensure the main WBS tasks headings arethe 5 PMBOK® process areas.Create a Work Breakdown Structure Codefor each task.Determine an overall project duration andduration estimates for each of the tasks. The duration is not to exceed 90days.Create accurate work package assumptionsand duration estimates.Include 7 resources assigned in theResource Sheet as “Work” types and 3 resources assigned as “ Material”types.Ensure the Resources are paid no morethan $30/hour and that the “Material” cost per use will not exceed$50.Include your resources and materials fromthe Resource Sheet in the task sheet.Create 10 dependencies in the TaskSheet.Yourassignment must follow these formatting requirements:Microsoft Project or its open sourcealternative in .mpp format.

    You can hire someone to answer this question! Yes, assignist.com has paper writers, dedicated to completing research and summaries, critical thinking tasks, essays, coursework, and other homework tasks. Its fast and safe.

    >>>ORDER NOW SECURELY–HIRE A PAPER WRITER<<<